|
Washington Operations Home |
JTCA Projects |
JTCB Projects |
JTCC Projects |
JTCD Projects
DCTS Interoperability Program Documentation
DCTS Home |
DCTS Documentation |
Test Status |
Capability Summary |
Certified Products |
CMO Exemptions
|
-
|
The following documents pertain to the DCTS Interoperability Program as outlined by OSD(C3I) and the
Collaboration Management Office (CMO). These documents are in PDF, Word, Excel and Powerpoint format and
can be downloaded by right clicking on the link and selecting "save target as" in MS IE or in Netscape,
clicking on the link and selecting "save" to save the file in a user specified location.
After reviewing the documents located here, to apply to enter the program and be placed in the queue to be
tested will require the submission of the following four items:
- The signed test agreement (included in the downloadable documents on this page).
- Funding for the appropriate level of test in the form of a check made payable to Commander, JITC.
- A copy of the completed entrance criteria checklist.
- A copy of any available installation, administration, operator documentation pertaining to the product(s) to be tested. (This can be in the form of manuals, paper documentation or links to the document locations if available on the web).
Please send items # 1, 2, & 3 To:
Commander, Joint Interoperability Test Command
ATTN: Business Management Branch (JTGB)
2001 Brainard Rd.
Fort Huachuca, AZ 85613-7051
Please send Item # 4 To:
Joint Interoperability Test Command
ATTN: DCTS Interoperability Testing Officer (JTCD)
Washington Operations Division
101 Strauss Avenue, Code 1348
Indian Head, MD 20640-5035
|
Last Revision: 14 Apr 08
|